Friday, August 21, 2020

Essay Questions Chapter 7

Paper Questions Chapter 7 Paper Questions Chapter 7 Section 5 8. a. 28800/263 = 109 units for each day (genuine yield) b. Effectiveness = Actual yield/Standard yield. The standard yield isn't given subsequently we can't discover the Efficiency. c. 38+34+35+32+30+34+22+18+20= 263 seconds Part 6 1. The procedure utilized here is mechanical production system. 2. Request Acceptance †NC Machine Programming †Board Fabrication - Load Board .33 min Operation 1.66min †Clean .50 Operation 1.66min †Coat .50 Operation 1.66min †Unload .33 Operation 1.66 min †Expose 1.72 †Load .33 Operation 1.82 min †Develop .33 Operation 1.82min †Inspect .50 Operation 1.82 min †Bake .33 Operation 1.82min †Unload .33 Operation 1.82min †Drilling 1.5 †Copper Plate .20 †Final Test 2.69min â€Shipping. 3. Get together limit = 60 board for every hour x 7.5 hour move = 450 Board limit = 47 sheets for every hour x 7.5 hour move = 352 As indicated by this limit of the two figurings they don't rise to each other. Thusly, they are not adjusted 4. The effect of the misfortunes is considerable as I would like to think. Creating 25% more than required is crazy. In addition to the fact that this wastes cash, time and assets however it one of the primary driver of the inability to meet limit or occupation amounts. Tossing out 25% of what you did that day is exorbitant. 5. Momentary I figure I would attempt to include some more penetrates representatives and drills. This is the longest piece of the procedure. On the off chance that there were more machines and individuals it would permit the front end procedure to create more sheets.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.